Frenger® supplied the multi-million-pound Dogger Bank Wind Farm Operations and Maintenance (O&M) base with their Slimline Compact Active Multi-Service Chilled Beam units, X-Wing® 'Radiant' Passive Chilled Beams, and their Frenger ENC Electric Radiant Heating Panels.
The base contains the infrastructure required to operate the offsite wind farm including the office, training, and welfare spaces for around 200 people and support the 277 offshore wind turbines.
Once all three stages are completed and delivered, the Wind Farm will have the capacity to generate over 3.6GW with an expected operational life of over 35 years.
Utilising low carbon materials in its construction, such as a Glue Laminated Timber (Glulam) frame and Cross Laminated Timber (CLT) roof and floor slabs, the base is being built and operated in line with UK Green Building Councils (UKGBC) Net Zero Carbon Framework.
News Article: Frenger supplies Dogger Bank Wind Farm Operations and Maintenance Base with Multi-Service Chilled Beams (MSCB).
Frenger's Multi-Service Chilled Beam units are 100% prefabricated and fully factory tested 'Plug n Play' integrated service module which saves onsite installation and the need for a suspended ceiling system. This therefore creates the appearance of greater volumetric space.